Ebbsfleet Engineering relocation Header
Case Studies
Quinton Hazell - Automotive Component Manufacturers
Decommissioning and re-installation of Riello Multi-head Machining Centre

Ebbsfleet Engineering Services were responsible for:-

Decommissioning, marking-up, dismantling and loading for transportation 50 tonne Riello Multi-head Machining Centre and misc Makino and Heller machine tools.

Abnormal Load Transportation from Kent to North Wales

Re-installation in North Wales

At the destination the ground loadings were not adequate for the loads i.e. a 56 tonne machine being lifted by a 500 tonne crane at a radius of 26 metres, giving a point load of 137 tonnes per square metre on each outrigger. Ebbsfleet Engineering Services designed a solution and installed a temporary grid system of supporting steels. The Riello Machine was then successfully crane loaded through the roof, re-installed and commissioned by Ebbsfleet Engineering Services.

Quinton Hazell

 

 

Quinton Hazell are impressed by Ebbsfleet's in depth technical knowledge of their machinery, our problem solving abilities and flexibility.

Contract Value: £90,000
Man Hours: 1,400